Plan on about $51,500 to $125,000 for a Junior ADU in California in 2027, $103,000 to $229,000 for a garage conversion, and $155,000 to $365,000 or more for a new detached ADU. Those 2027 figures are today’s 2026 prices plus the 3.1% to 4.2% rise that JLL forecasts for construction bids in 2027.
Nobody has real 2027 ADU prices yet, and anyone who claims to is guessing. This guide gives you current 2026 data, the new state laws that take effect January 1, 2027, and a simple way to budget for next year. Every number links to its source at the bottom.
Disclosure: this guide contains Amazon affiliate links. As an Amazon Associate, Santa Clarita ADU earns from qualifying purchases, at no extra cost to you.
How much will each type of ADU cost in 2027?
| ADU type | Typical 2026 cost | 2027 budget (2026 + 3.1% to 4.2%) |
|---|---|---|
| Junior ADU (up to 500 sq ft) | $50,000 to $120,000 | about $51,500 to $125,000 |
| Garage conversion | $100,000 to $220,000 | about $103,000 to $229,000 |
| Attached ADU | $200,000 to $350,000 | about $206,000 to $365,000 |
| Detached ADU | $150,000 to $350,000+ | about $155,000 to $365,000+ |
| Prefab ADU, installed | $120,000 to $320,000+ | about $124,000 to $333,000+ |
The 2026 ranges come from recent Los Angeles-area cost data, which sits near the middle of California’s range. The 2027 column is our own arithmetic: the low end raised 3.1% and the high end raised 4.2%. It is a planning number, not a quote.
Why are ADU costs expected to keep rising in 2027?
Material and bid prices are still climbing, and forecasters don’t expect a drop.
- Bids: JLL forecasts U.S. construction bid prices (tender prices) rising 3.1% to 4.2% in 2027. That is slower than recent years but above the pre-2020 pace of 2% to 3% a year.
- Materials: overall construction input prices rose 11.2% from September 2025 to September 2026, according to Associated Builders and Contractors. That was the largest annual rise in nearly four years.
- Residential goods: NAHB reported that goods used in new home construction cost 6.7% more in July 2026 than a year earlier, or 5% more excluding energy.
- Lag: bid prices tend to trail material costs by about nine months, so some of the 2026 increases may still show up in 2027 quotes.
How do ADU costs compare across California?
Where you build changes the price more than almost anything else. The table below compares a mid-range 600 sq ft detached ADU across 10 cities, using one source that indexes RSMeans construction data to each city.
| City | Basic | Mid-range | High-end | Permit fees (est.) |
|---|---|---|---|---|
| San Francisco | $128,000 | $192,000 | $265,000 | $18,000 |
| Oakland | $118,000 | $177,000 | $245,000 | $14,000 |
| San Jose | $122,000 | $183,000 | $253,000 | $15,000 |
| Los Angeles | $115,000 | $172,000 | $238,000 | $12,000 |
| San Diego | $108,000 | $162,000 | $224,000 | $10,000 |
| Santa Rosa | $108,000 | $162,000 | $224,000 | $9,000 |
| Riverside | $99,000 | $148,000 | $205,000 | $7,500 |
| Sacramento | $98,000 | $147,000 | $204,000 | $8,000 |
| Bakersfield | $90,000 | $135,000 | $187,000 | $6,500 |
| Fresno | $88,000 | $132,000 | $183,000 | $6,000 |
Use this table to compare regions, not to set your budget. Its numbers run lower than many contractor quotes, including the ranges in the first table. What it shows well is the spread: a mid-range build in San Francisco costs about 45% more than the same build in Fresno.
Which new California ADU laws take effect January 1, 2027?
Three bills signed on September 29, 2026 change ADU costs and options starting January 1, 2027.
| Law | What changes | Effect on your budget |
|---|---|---|
| SB 1117 | Impact fees on an ADU over 750 sq ft can only be charged on the area above 750 sq ft, for up to two ADUs on a lot. | An 800 sq ft ADU now pays impact fees on 50 sq ft instead of 800. Larger units save the most. |
| AB 956 | Cities must approve up to two new detached ADUs on a single-family lot, with side and rear setbacks of no more than 4 feet. Cities can cap each at 800 sq ft. HOA and CC&R limits on ADUs now also cover lots zoned to allow single-family homes. | You can plan two rental units, but a city doesn’t have to approve a Junior ADU on a lot with two detached ADUs. |
| SB 1196 | The CPUC must set utility timelines for small power hookups, including new ADUs. Rules are due by September 30, 2027. | Applicants can file the power request alongside the building permit, which could shorten waiting time once the rules are in place. |
One 2026 change still matters: since January 1, 2026, an ADU or JADU of 500 sq ft or less is not subject to school impact fees. School districts can still charge fees on larger units.
Thinking about two units? See whether building two ADUs is worth it for the rental math.
Should you build now or wait until 2027?
If your ADU is 750 sq ft or less, waiting doesn’t lower your fees, and construction prices are forecast to keep rising. Starting sooner usually costs less.
If you plan an ADU over 750 sq ft, or two detached ADUs, the 2027 rules may help you. Ask your city or county which date its fees and rules are based on, such as application, approval, or permit issuance, before you decide when to file.
What drives the price of an ADU in 2027?
- Size and type: conversions reuse existing walls and roofs. Detached units need everything new.
- Utility distance: every foot of trench from the main house to the ADU adds cost for water, sewer, and power.
- Site conditions: slopes, poor soil, septic systems, and fire hazard zones can add tens of thousands of dollars. See building on a sloped lot.
- Region: Bay Area labor and permit fees run highest. The Central Valley and Inland Empire run lowest.
- Finishes: mid-range finishes keep a rental ADU affordable and durable.
Which tools help you plan an ADU budget?
A few inexpensive tools let you gather the measurements contractors ask for, so your first quotes are more accurate.
Bosch GLM165-40 Blaze Pro laser measure
Measure your garage interior, or the open space between your house and property lines, before you request quotes. Setbacks of 4 feet and an 800 sq ft cap make accurate measurements matter. It measures up to 165 feet and calculates area for you.
Zozen measuring wheel
Utility distance is one of the biggest hidden costs. Walk the path from your main sewer cleanout, water line, and electrical panel to the ADU spot so you know the trench length before a contractor prices it.
Backdoor Revolution: The Definitive Guide to ADU Development
Kol Peterson’s book walks through ADU design, financing, and building from start to finish. It isn’t California-specific, so pair it with the state rules above.
Want a real price for your property?
If you’re in the Santa Clarita Valley, call (661) 486-8393. If no one answers, leave a voicemail with your name, phone number, address, and the type of ADU you want. You can also use the contact form. We’ll pass your details to a local ADU contractor who can price your project. There’s no obligation to hire.
For local numbers, see how much an ADU costs in Santa Clarita.
2027 California ADU pricing FAQs
How much will an ADU cost in California in 2027?
Plan on about $155,000 to $365,000 or more for a new detached ADU, $103,000 to $229,000 for a garage conversion, and $51,500 to $125,000 for a Junior ADU. These are 2026 prices raised by JLL’s forecast 3.1% to 4.2% increase in construction bids for 2027.
Will ADU costs go down in 2027?
Forecasts don’t point to a drop. JLL expects construction bid prices to rise 3.1% to 4.2% in 2027, and material input prices rose sharply through 2026.
What is the cheapest type of ADU to build in California?
A Junior ADU, built inside your existing home, usually costs the least, followed by a garage conversion. Both reuse existing walls, roofs, and foundations.
How does SB 1117 lower ADU impact fees?
Starting January 1, 2027, impact fees on an ADU over 750 sq ft can only be charged on the area above 750 sq ft, for up to two ADUs on a lot. A 1,000 sq ft ADU pays on 250 sq ft instead of the full 1,000.
Can I build two detached ADUs in California in 2027?
Yes. Under AB 956, starting January 1, 2027, cities must approve up to two new detached ADUs on a lot with a single-family home. Cities can limit each one to 800 sq ft, and they don’t have to approve a Junior ADU on that lot too.
Where is it most expensive to build an ADU in California?
The Bay Area, led by San Francisco, San Jose, and Oakland. The Central Valley, including Fresno and Bakersfield, is among the least expensive.
Sources
- CRE Daily: JLL sees 2027 construction costs rising 3.1% to 4.2% (Nov 13, 2026)
- BD+C: construction input prices up 11.2% year over year (ABC analysis, September 2026)
- HousingWire: NAHB on rising residential material costs
- CostToBuildHouse: 2026 California ADU cost guide (city table, RSMeans-indexed)
- ADUscale: ADU cost in Los Angeles (2026)
- GreatBuildz: cost to build an ADU in Los Angeles (2026)
- Holland & Knight: California’s 2027 housing laws (SB 1117, AB 956, SB 1196)
- Brownstein: California enacts another wave of 2026 housing bills (AB 956 and SB 1117 details)
- California YIMBY: SB 1117 fact sheet
- Lozano Smith: SB 543 and school impact fees on ADUs